MIE Offshore Solutions Projects in 2014

Listed below are the projects that we have work on and completed in the year of 2014

  • Propose Modification to Existing Expandable Polystyrene (EPS) and Tamol Plant
  • 8,000 manhours

    BASF (M) Sdn Bhd / OGPP Engineering Sdn Bhd

    BASF (M) Sdn. Bhd, Pasir Gudang, Malaysia is planning to convert the existing EPS plant into a polymer dispersions plant in Pasir Gudang, Malaysia with a capacity of 60 kT/a. The plant will be located in the area of Pasir Gudang Free Trade Zone Complex. All utilities’ lines (i.e. compressed/ instrument air, nitrogen, steam, process water, demineralized water) are all available from the existing plant. Conversion of the existing plant comprises of Reactor, Vessel, Agitators, Tank Farms and New Deluge Systems.
  • Project Pictures

    ... ... ... ... ... ...
  • EPCI of Deep Drawn Booster Compressor (DDBC) Pilot Project at Arthit Field
  • 4,500 manhours

    PTT Exploration & Production Public Company Limited / CES Engineering & Maintenance Limited

    Located at Arthict development area, the Booster Project Phase III, one standard booster compressor was decided to be installed on AWP3 Platform. A new package called Deep Drawn Booster Compressor was introduced to Arthit asset as a pilot booster compressor with higher compression ratio.
  • Project Pictures

    ... ... ...
  • Provision of Conceptual & FEED for Bayan In-Fill Project at BYDP-B
  • 2,500 manhours

    Haliburton Bayan Petroleum (HBP) / Dialog Offshore Engineering Sdn Bhd

    The Bayan field is located about 64 km off the coast of Bintulu, Sarawak with a water depth of approximately 28 meter. The Bayan field is flanked by the D18 field on the North East side and Temana field on the South East side. HBP is plan to develop 2MMstb oil reserve by drilling 2 infill wells on BYDP-B platform and this 2 infill wells will be drilled from new well slots with deck extension.
  • Project Pictures

    ... ... ...
  • EPCIC of Deck Extension for Bayan Redevelopment Project Phase1 –In-Fill-well + Phase 2A
  • 8,675 manhours

    Haliburton Bayan Petroleum (HBP) / Dialog Offshore Engineering Sdn Bhd

    The Bayan field is located about 64 km off the coast of Bintulu, Sarawak with a water depth of approximately 28 meter. The Bayan field is flanked by the D18 field on the North East side and Temana field on the South East side. HBP is plan to develop 2MMstb oil reserve by drilling 2 infill wells on BYDP-B platform and this 2 infill wells will be drilled from new well slots with deck extension.
  • Project Pictures

    ... ... ...
  • EPCIC of Gassifier Steam Boiler Renewal Energy Plant
  • 8,500 manhours

    NSE Resources Corporation (M) Sdn Bhd

    NSE Resources Corporation (M) Sdn Bhd plans to build the Gasifier Steam Boiler Renewable Energy Plant at Kerteh Polymer Plastic Park, Kerteh. The gasifier steam boiler plant will consists of 3 nos of 60 tph boilers at design pressure of 32 barg that will use Syngas as main fuel with a capability of using direct biomass burning as secondary fuel, and natural gas as tertiary fuel. However, these boilers will only commission in year 2014.
  • Project Pictures

    ... ... ...
  • Provision of IFL Offshore Engineering Services for SKO PL-218 & PL-221
  • 5,000 manhours

    OPDEX Engineering Sdn Bhd / PCSB-SKO

    Corrosive effects of productions fluids on carbon steel pipelines necessities corrosion prevention or mitigation measures to protect many pipelines. The advantages of having infield liner (IFL) as a corrosion barrier inside carbon steel pipeline has been previously published, and repeatedly used by the onshore oil and gas industry over 15 years ago. The advantages of infield liner (IFL) application can be generating as follows:
    • Reduced installation time and cost
    • Increased liner insertion lengths (without termination)
    • Low thermal conductivity
    • Effective protection of internal corrosion & MIC
    • Increased life expectancy
    • Wax and sedimentation
  • Project Pictures

    ... ... ...
  • Provision of Piping Engineering Works for Balai Cluster EPV Upgrading Project
  • 500 manhours

    BC Petroleum Sdn Bhd / Dialog Offshore Sdn Bhd

    The Balai Cluster consists of four different field which are located offshore Sarawak (Malaysia). These include: Balai, Bentara, West Acis and Spaoh. The development is located approximately 100 to 130 Km northeast of Bintulu. Water depth over the field varies from 46m to 64m. The fields will be developed and operated by BC Petroleum (an incorporated joint venture company set up expressly for the development of the Balai Cluster).
  • Project Pictures

    ... ... ...
  • Provision of Engineering Manpower Supply for Sapura Kencana Energy Development Work
  • 800 manhours

    Sapura Kencana Energy Sdn Bhd

    SK310 is a sizeable gas block located about 80 km offshore Miri, Sarawak and about 35km south-east of the existing B11 processing platform operated by Sarawak Shell Berhad (SSB). Figures below show the approximate location of B15 and other surrounding fields.
  • Project Pictures

    ... ... ...
 
©2018 MOFS. All rights reserved.
MIE OFFSHORE SOLUTIONS SDN BHD (1004204-P) T6-2-2 & T6-3-2 TOWER 6 MAJU LINK
JALAN LINGKARAN TENGAH II (MRR2) 57100 BANDAR TASIK SELATAN KUALA LUMPUR, MALAYSIA