Webmail  e-Timesheet

MIE Offshore Solutions Projects in 2015

Listed below are our on-going projects in the year of 2015

  • Provision of Manpower Supply for SKE-408 Project
  • 4,800 manhours

    Sapura Kencana Energy Sdn Bhd / Brunel-Energy (Malaysia) Sdn Bhd

    SapuraKencana Energy Inc. (SKE), Petornas Carigali (PCSB) and Sarawak Shell Berhad (SSB) are Joint Venture (JV) Partners in the Production Sharing Contract (PSC) for block SK408 located offshore Sarawak. SKE (Operator), PCSB and SSB hold 40%, 30% and 30% equity interest respectively. Block SK408 is located approximately 150km northwest of Miri, Sarawak, covers an area of 4,480km2 with water depths ranging from 70m to 115m
  • Project Pictures

    ... ...
  • Provision of Mooring Engineering Services for Tembikai CPP
  • 500 manhours

    Vestigo Petroleum Sdn Bhd / Primer Smartech Sdn Bhd

    Vestigo Petroleum Sdn Bhd (VPSB) is currently develop the Tembikai marginal field located approximately 150km east Kuala Terengganu, Offshore Peninsular Malaysia in Block 314 (previously known as Block PM-10 and PM-304). MOFS have been responsible to ensure all marine spread activity during the operation is acceptable within the field vicinity and meet project requirement acceptance by Vestigo and MWS in term of HSE, Operational and best engineering practice.
  • Project Pictures

    ... ... ... ...
  • Provision of Conceptual Study for Sand Removal and Disposal System at Duyong Platform
  • 652 manhours

    Petronas Carigali Sdn Bhd / Dialog Offshore Engineering Sdn Bhd

    Duyong gas field is located 220km northeast of the east coast of Peninsular Malaysia. There are three (3) Satellite Platforms, one (1) Central Processing Platform, one (1) Gas Compression Platform, one (1) Living Quarter Platform and one (1) Flare Tripod Platform. Duyong CPP is located in approximately 73.6 meters of water and its facility is designed for continuously manned operation. The platform has a bridge connecting it to DDP-B, LQ, GCP and flare tripod. Originally, Duyong CPP was designed to process fluid flowing from DDP-A, DDP-B and DDP-C which consist of hydrocarbon gas, condensate and water.
  • Project Pictures

    ...
  • Provision of Engineering Services for Plant Modification and Improvement Project at Gas Processing & Utilities (GPU)
  • Workorder Basis manhours

    Petronas Gas Berhad (PGB) / Maju Integrated Engineers Sdn Bhd (MIE)

    There are two (2) parts of scope of work under this CONTRACT: (PART A) Engineering Services and (PART B): Man Power Supply. The CONTRACT is valid for a period of three (3) years with the option to extend another two (2) years. The areas covered under this CONTRACT shall be devided as follows:
    • Gas Processing Kerteh (GPK) – (GPP1/2/3/4 & DPCU2), Compressor Station (KCS), Kerteh Shared Marine Facilities (KSMF)
    • Gas Processing Santong (GPS) - (GPP 5/6 and DPCU 3)
    • Utility Kerteh & Utility Gebeng
    • Tanjung Sulong Export Terminal (TSET)
  • Project Pictures

    ...
 
©2018 MOFS. All rights reserved.
MIE OFFSHORE SOLUTIONS SDN BHD (1004204-P) T6-2-2 & T6-3-2 TOWER 6 MAJU LINK